Machine Cost Calculation - An Example in a Road Building Project in Siran Forest Division N.W.F.P.

Machine Cost Calculation - An Example in a Road Building Project in Siran Forest Division N.W.F.P.

Gerhard Stoehr

ABSTRACT

For the calculation of cost of machine operations different costs like capital costs, personal costs and overhead costs are taken into consideration. Capital costs are the actual costs of the machine and are further divided into fixed, semi-variable and variable costs. Hourly cost of machine operation is calculated by summing up different costs (capital costs + personal costs + administration costs + overhead costs) divided by the useful life of the machine in hours. Hourly cost of machine when divided by the hourly productivity of the machine gives the machine cost/unit of production. Based on this scheme, cost of road construction with an angledozer in Siran Forest Division was calculated as Rs.10.30/m3 (US$ 0.56/m3) of loose earth and Rs.12.83/m3 (US$0.69/m3) of un-excavated earth. These figures of cost of angledozer provide useful information for cost estimation of road construction projects, with the use of angledozer, in mountainous regions of Pakistan.

To share on other social networks, click on any share button. What are these?

Pakistan Journal of Forestry

June

Vol. 74, Iss. 1

Featuring

Click here for more

Subscribe Today

Receive free updates on new articles, opportunities and benefits


Subscribe Unsubscribe