Abstract
Intro: Although raising of chir pine in polythene tubes and its planting out was started quite a few years back, the methods adopted in actual practice left much to be desired. Under the Hazara Preinvestment Project, World Bank authorities desired that in view of the extensive planting programme involved in the project it would be better if these practices were standardized for the benefit of the field foresters. The job was assigned to the Pakistan Forest Institute.
The full text of this article is available as a PDF — use Download PDF above.
Services
Article usage statistics
Loading…

